East Campus Power Shutdown 슬롯 사이트2 일
As part of the overall campus electrical services upgrade currently underway, the East Campus Electrical Substation will need to be shut down for approximately 8 hours on Friday, June 12 from approximately 7 AM until 3 PM. 영향을받는 건물은 다음과 같습니다.
- 고든 도서관
- Fuller Laboratories
- Kaven Hall
- Atwater Kent Laboratories
- Salisbury Laboratories
모든 당사자는 이전에 통보되었습니다.